What the Construction Regulations add to the OHS Act
The Act makes somebody responsible. The Regulations decide who, in writing, before anybody starts, and two of those documents belong to the client.
Open 24 hours, 365 days078 497 3616
Who may lawfully do what work on a South African site, and the paperwork that proves it: cidb grading, NHBRC, CSD registration, the Construction Regulations.
Start with the registers. Most of what goes wrong on a South African site was visible before award in a database that is free to search: the cidb register and its removals notices, National Treasury's restricted suppliers, the Department of Employment and Labour's registered persons, the Compensation Fund's letters of good standing. These pieces read those registers so a client, a contractor or a supplier does not have to learn them the expensive way.

The Act makes somebody responsible. The Regulations decide who, in writing, before anybody starts, and two of those documents belong to the client.

The builder registers. The home is enrolled. Two different acts, and in practice the person selling the unit is the one exposed when the second is skipped.

The answer has two halves and most contractors only check one, which is why a current registration still loses the appointment at scope review.

In Soweto the notice went to the tenant, the repair runs through the landlord, and only an inspector can say the building may reopen.

It does not come from the municipality and your approved plans do not cover it. Two different duties sit with the Department of Employment and Labour.

Earthworks, hauling and dust suppression on a mine can fall under the civil engineering council, whatever the site. How to check before the principal asks.

An accredited person inspected specified work and found it met the standard that day. Everything outside those words is not covered by the page.

It never expires. But it cannot carry a transfer once it is two years old, and it does not cover anything added or altered after it was issued.

File your outstanding Return of Earnings before 31 October 2026, or the Commissioner may assess your firm on an estimate and add a penalty.

If you build homes in South Africa, the firm registers with the NHBRC and each home is enrolled. Gauteng's next housing lines make that urgent.

Nothing visible happens for a long stretch. What is running in that time is a set of queries to outside registers, each answering at its own pace.

Getting on a list takes a morning. Being called off one depends on something the Competition Commission has now measured properly.

The CSD is mandatory and finds you nothing. The work a small firm can win sits on the municipality's own noticeboard, and none of it has to reach eTenders.

There is no single contractor accreditation in South Africa, only trade registers, each buyer's own list, and the check a client relies on.

A certificate shows a firm was registered on the day it was printed. The register answers today, and grade, class and status all have to match the job.

The dtic withdrew its certificate rule for certain Chinese imports two days after it was due to start. The compulsory specifications and site check stay.

The Constitutional Court struck down the Public Procurement Act on 17 September, so you register exactly where you registered before the ruling.

The register answers in two minutes, and a comment window closing 24 October may make it decide who hears your complaint when the work fails.

A Special Tribunal set aside housing appointments the SIU valued at around R30 million. Read the ruling backwards and it is a list of the checks nobody ran.

The check is the same five registers for one firm or twenty. A panel makes it recur, and a buyer running seven identical tenders pays for it seven times.

A cidb grade is a claim the regulator can reopen. We find a reliable one with a dated register check and the habits no register records.

Refuse the tray, sign the amended quote, and the plumber's non-compliance note moves the cost of the next failure from their insurer to your cupboards.

The registration is personal, it attaches to the safety officer the contractor appoints, and a client checks the named person against the council, not the firm.

The draft second edition does not touch your grading. It rewrites how every organ of state applies the register. Comments closed 30 September 2026.

One completed contract at the next grade's track record minimum, the turnover and capital beside it, and a 21-day pack. The grade follows the work.

A grade and a class, read together. In September 2026 one panel drew its line at 6CE, and the rest of the board drew it everywhere from grade 1 to grade 9.

The contract already carries the remedy, and the compliance file that keeps you on site quietly expires while you wait for the money.

It covers the contractor's own employees for injury at work. It does not cover your tenants, your visitors or a child hurt on your property.

The application takes an hour. What takes three weeks is chasing documents that could not be issued until something else existed first.

Every commercial borehole had to be registered for water use by about 23 July 2026, and the sanction for missing it is criminal rather than administrative.

The Minister counts 52 contractors off the cidb register against two in its first 22 years, and the gazette is already ahead of him.

Two written appointments under the Construction Regulations are the client's. The rest belong to the contractor. Investigators went looking for that paperwork.

A GreenCard is not a registration, and the PV installer holding one may have no statutory authority to do the electrical work on your roof.

Treasury has recorded 35 companies and 45 directors after Eskom's referrals, and a listed name walks into the next company you register.

Four of the five checks that decide whether a contractor may lawfully work on your site are free, and most clients run only one of them.