
What cidb grading you need for a R2 million contract
The answer has two halves and most contractors only check one, which is why a current registration still loses the appointment at scope review.
Open 24 hours, 365 days078 497 3616

The answer has two halves and most contractors only check one, which is why a current registration still loses the appointment at scope review.

There is no single contractor accreditation in South Africa, only trade registers, each buyer's own list, and the check a client relies on.

A certificate shows a firm was registered on the day it was printed. The register answers today, and grade, class and status all have to match the job.

Six public buyers had built-environment panels open on 29 September 2026, and a panel place is applied for like a tender but paid for like a promise.

A cidb grade is a claim the regulator can reopen. We find a reliable one with a dated register check and the habits no register records.

The draft second edition does not touch your grading. It rewrites how every organ of state applies the register. Comments closed 30 September 2026.

One completed contract at the next grade's track record minimum, the turnover and capital beside it, and a 21-day pack. The grade follows the work.

A grade and a class, read together. In September 2026 one panel drew its line at 6CE, and the rest of the board drew it everywhere from grade 1 to grade 9.

Nine grades, nine ceilings. The grade that earns is the one that matches work actually being advertised, not the one at the top of the table.

The Minister counts 52 contractors off the cidb register against two in its first 22 years, and the gazette is already ahead of him.

Four of the five checks that decide whether a contractor may lawfully work on your site are free, and most clients run only one of them.
The Arabella Brief
One email on a Friday, covering the week from Friday to Thursday so the week is closed when it is written. What actually changed, everything with a date on it, one development run through what it means for a contractor with forty people, and what we got wrong. A thin week is a short issue.