
Landlord repair obligations, and the tenant's repair bill
A landlord may have to pay a tenant back for an urgent repair, and the Rental Housing Tribunal's ruling carries the force of a court judgment.
Open 24 hours, 365 days078 497 3616
What things cost, what drives the number, and how the decision gets made. Pricing, retention, payment, and the gap between award price and outturn cost.
Every number in a South African construction price has a source, and most of them move: the fuel price, the steel safeguard duty, the carbon tax, the municipal tariff, the prime rate on the retention still held. These pieces trace each one back to the gazette or the release it came from, convert it to rands at a stated rate, and say what it does to a rate sheet.

A landlord may have to pay a tenant back for an urgent repair, and the Rental Housing Tribunal's ruling carries the force of a court judgment.

Britain has been consulting on a minimum handover pack. JBCC already obliges your contractor to hand one over, but leaves what is in it to your contract data.

Steel main from DN600 to DN1600, centrifuge decanters, a 1 250kVA generator and a SCADA system are all named in R35 billion of planned water work.

Broll's Wynberg lot shows R2,14m gross, R1,03m recoveries and R2,06m net. Those numbers fit two very different investments, and the listing does not say which.

Our catalogue holds 36 public generator lines this week. Who is buying, and the four different points at which a model gets written into the spec.

SANRAL has at least 40 routine road maintenance contractor lots open in nine provinces, and eleven compulsory briefings fall between 12 and 19 October.

A late contractor owes the daily penalty written into the contract, and nothing if the Contract Data was left blank. Here is where the penalty stops.

Tshwane's RFI on alternative potable water sources closes on 30 October, and the City will use the answers to write the tender specification.

Under the JBCC the principal agent instructs, under the NEC the project manager does, and an instruction from anyone else is a risk you price yourself.

A tender that closed with no award posted is a buyer who needed the work done. Five on Gauteng ground from late September 2026, and the call to make.

Britain's new trusted trader scheme is voluntary. South Africa already has five registers, and a deposit rule that only bites once the money has gone.

Six public buyers had built-environment panels open on 29 September 2026, and a panel place is applied for like a tender but paid for like a promise.

iTonka Square in Springs was rebuilt in eight months by a trade list anyone could read. By opening day, every one of those packages was long gone.

Public buyers re-advertise the same refurbishment and the same maintenance contract. The board shows why a second advert rarely fixes the first.

Start with the trade, because the shortage is uneven. Here is what our network could put on a Johannesburg site on 21 September 2026, and where it could not.

Five clauses decide it: deposit, certificate, retention, escalation and remedy. Each has a date, and the money moves on those dates or not at all.

South Africa's economy contracted in the second quarter while construction grew, and the gap between buildings and works tells you which jobs to chase.

ITAC added South Korean hot-rolled steel to the safeguard on 4 September 2026 at 11 percent, and the origin of your fabricator's coil now sets part of the rate.

Municipal distributors sell 44% of South Africa's electricity, and a correctly specified protection device only survives their tender if the document says so.

Retention runs on your contract's clock, not on a statutory one, and on a R3 million job the 5% still held at month nine is R150 000 of yours.

Diesel rose R2,94 a litre on 2 September, and whether you recover any of it was decided by a clause you signed three months ago.

Headline inflation fell to 4,3% while the services a building actually buys went up by twice that, which is why the maintenance budget broke.
The Arabella Brief
One email on a Friday, covering the week from Friday to Thursday so the week is closed when it is written. What actually changed, everything with a date on it, one development run through what it means for a contractor with forty people, and what we got wrong. A thin week is a short issue.